Copper Dragon Brewery

 

Project Brief

Design, obtain planning and build a unit to house Copper Dragon's new Brewery whilst optimising the available space on site and considering local flood risk

Unique Challenges

  • There was a strong possibility that soft ground would be encountered during placing of the foundations
  • Numerous drains ran across the site in many directions
  • The site was in a flood risk area
  • There wasn't enough fall to the distant mains sewer
  • The brewery demanded large gas and water supplies
  • The internal layout needed to allow for future expansion of the brewery equipment

Groundworks commencing on site

Design

  • A ground beam foundation was designed which incorporated a retaining wall, this enabled the whole area within the building to be raised 1.2 metres and the external yard to the front elevation to be raised to the required level whilst maintaining forklift access around the sides of the building
  • A complete new drainage system was designed that would accept all new and diverted drains and keep them outside the building footprint.
  • The floor needed many drainage channels and had to be laid to falls. These drains then discharged through trade effluent tanks and flow metres before being pumped to the main sewer.
  • New water and gas supplies were fed into the building
  • Mezzanine floors, high level walkways and roof level trusses all had to be designed around the proposed brewery equipment to aid production and to ‘future-proof' the building for further development

 

Preparing for pouring the retaining wall

Pouring the retaining wall

Construction

  • Demolish an existing building
  • Prepare the site
  • Lay new and divert existing drains
  • Lay foundations and cast retaining wall
  • Raise level of site
  • Construct trade effluent tank and pumping chamber
  • Erect steel frame, mezzanine floor and cladding
  • Lay floor slab and drainage channels
  • Build internal blockwork
  • Fit walkways, roof level trusses and staircase
  • Lay external kerbing and surfacing
  • Fix new palisade fencing
  • Client fits new brewery equipment and specialist floor covering

 

Steel framework being erected

Cladding using a Clad Boy

Placement of the concrete floor

Gantry installation

 

Toasting completion of the new Brewhouse with Copper Dragon MD, Steve Taylor

Photo Gallery

Click here for online construction photo gallery

 

360-degree Virtual Tours

Click on the images below to view virtual tours of the Copper Dragon Brewhouse construction

Groundworks beginning

Steel framework during construction

Roofing in progress

Internal block work in progress